The subfloor started rotting and needing repair. First, the tile flooring had to be removed to get to the sub floor. After tile was removed then the damaged subfloor was removed. Before replacing the damaged subfloor with treated plywood, the joists were inspected and repaired if it was damaged. Once the subfloor was repaired, the new tile floor was installed.